122Total Project Risk: A.should not be calculated for small projects B.is the probability

122 Total Project Risk:

A. should not be calculated for small projects

B. is the probability of each project risk event times the sum of the consequences of individual project risk events which could occur during the project.

C. Is the cumulative sum of the probability of each individual project risk event times the consequences of occurrence of that risk event.

D. A and B

E. A and C

点击查看答案

第2题

52Project Risk _____ . A.should not be calculated for small projects. B.is the probability

52 Project Risk _____ .

A. should not be calculated for small projects.

B. is the probability of each risk event minus the sum of the consequences of potential risk events.

C. is the cumulative effect of uncertain occurrences which will adversely affect project objectives. D. cannot be quantified for first time projects.

E. B or D

点击查看答案

第3题

4Total Project Risk: A.should not be calculated for small projects B.is the probability of

4 Total Project Risk:

A. should not be calculated for small projects

B. is the probability of each project risk event times the sum of the consequences of individual project risk events which could occur during the project.

C. Is the cumulative sum of the probability of each individual project risk event times the consequences of occurrence of that risk event.

D. A and B

E. A and C

点击查看答案

第4题

The total amount of risk that is calculated for a project is found by:A.Multiplying the su

The total amount of risk that is calculated for a project is found by:

A.Multiplying the sum of each the risks times the amount at stake

B.Calculating the cumulative sum of the probability for each risk and multiplying this value times the consequence of occurrence of the risk events

C.Cannot be calculated since all risks are not known

D.The amount of project reserves available

点击查看答案

第5题

Total Project Risk:Ashould not be calculated for small projectsBis the probability of each

Total Project Risk:

A should not be calculated for small projects

B is the probability of each project risk event times the sum of the consequences of individual project risk events which could occur during the project.

C Is the cumulative sum of the probability of each individual project risk event times the consequences of occurrence of that risk event.

D A and B

E A and C

点击查看答案

第6题

Project Risk _____ .Ashould not be calculated for small projects.Bis the probability of ea

Project Risk _____ .

A should not be calculated for small projects.

B is the probability of each risk event minus the sum of the consequences of potential risk events.

C is the cumulative effect of uncertain occurrences which will adversely affect project objectives.

D cannot be quantified for first time projects.

E B or D

点击查看答案

第7题

It can be concluded from the text that airlines' war and terrorist risk ______.A.should be

It can be concluded from the text that airlines' war and terrorist risk ______.

A.should be attended to cautiously.

B.should be left with the government alone.

C.should be accepted reluctantly.

D.should be left up to insurance companies.

点击查看答案

第8题

If an auditor believes the chance of financial failure is high and there is a corresponding increase in business risk for the auditor, acceptable audit risk would likely

A、be reduced.

B、be increased.

C、remain the same.

D、be calculated using a computerized statistical package.

点击查看答案

第9题

The schedule risk is the _____ .Athe accumulated "expected' durations which maintain proje

The schedule risk is the _____ .

A the accumulated "expected' durations which maintain project completion.

B Critical Path adjusted by "high-risk" activity float.

C highest risk path that maintains quality.

D Critical Path when calculated with "most likely" duration.

E highest risk path that contributes the most risk toward the project completion.

点击查看答案
下载上学吧APP
客服
TOP
重置密码
账号:
旧密码:
新密码:
确认密码:
确认修改
购买搜题卡查看答案
购买前请仔细阅读《购买须知》
请选择支付方式
微信支付
支付宝支付
选择优惠券
优惠券
请选择
点击支付即表示你同意并接受《服务协议》《购买须知》
立即支付
搜题卡使用说明

1. 搜题次数扣减规则:

功能 扣减规则
基础费
(查看答案)
加收费
(AI功能)
文字搜题、查看答案 1/每题 0/每次
语音搜题、查看答案 1/每题 2/每次
单题拍照识别、查看答案 1/每题 2/每次
整页拍照识别、查看答案 1/每题 5/每次

备注:网站、APP、小程序均支持文字搜题、查看答案;语音搜题、单题拍照识别、整页拍照识别仅APP、小程序支持。

2. 使用语音搜索、拍照搜索等AI功能需安装APP(或打开微信小程序)。

3. 搜题卡过期将作废,不支持退款,请在有效期内使用完毕。

请使用微信扫码支付(元)
订单号:
遇到问题请联系在线客服
请不要关闭本页面,支付完成后请点击【支付完成】按钮
遇到问题请联系在线客服
恭喜您,购买搜题卡成功 系统为您生成的账号密码如下:
重要提示: 请勿将账号共享给其他人使用,违者账号将被封禁。
发送账号到微信 保存账号查看答案
怕账号密码记不住?建议关注微信公众号绑定微信,开通微信扫码登录功能
警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

- 微信扫码关注上学吧 -
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反上学吧购买须知被冻结。您可在“上学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
- 微信扫码关注上学吧 -
请用微信扫码测试
选择优惠券
确认选择
谢谢您的反馈

您认为本题答案有误,我们将认真、仔细核查,如果您知道正确答案,欢迎您来纠错

上学吧找答案