第1题

●The actual configuration of a PERT/CPM network _____ the amount of resources that can be

● The actual configuration of a PERT/CPM network _____ the amount of resources that can be devoted to the project.

A Increases.

B Is not affected by

C Does not require

D Is heavily dependent upon

E Is the only means of determining

点击查看答案

第2题

101The actual configuration of a PERT/CPM network _____ the amount of resources that can b

101 The actual configuration of a PERT/CPM network _____ the amount of resources that can be devoted to the project.

A. Increases.

B. Is not affected by

C. Does not require

D. Is heavily dependent upon

E. Is the only means of determining

点击查看答案

第3题

183The actual configuration of a PERT/CPM network _____ the amount of resources that can b

183 The actual configuration of a PERT/CPM network _____ the amount of resources that can be devoted to the project.

A. Increases.

B. Is not affected by

C. Does not require

D. Is heavily dependent upon

E. Is the only means of determining

点击查看答案

第4题

The first step in building a PERT/CPM network is to:A.Create a flow chartB.Determine the c

The first step in building a PERT/CPM network is to:

A.Create a flow chart

B.Determine the critical path

C.Show task relationships

D.Create a work breakdown structure

E.None of the above.

点击查看答案

第5题

●The first step in building a PERT/CPM network is to:ACreate a flow chartBDetermine the cr

● The first step in building a PERT/CPM network is to:

A Create a flow chart

B Determine the critical path

C Show task relationships

D Create a work breakdown structure

E None of the above.

点击查看答案

第6题

190The first step in building a PERT/CPM network is to: A.Create a flow chart B.Determine

190 The first step in building a PERT/CPM network is to:

A. Create a flow chart

B. Determine the critical path

C. Show task relationships

D. Create a work breakdown structure

E. None of the above

点击查看答案

第7题

72The first step in building a PERT/CPM network is to: A.Create a flow chart B.Determine t

72 The first step in building a PERT/CPM network is to:

A. Create a flow chart

B. Determine the critical path

C. Show task relationships

D. Create a work breakdown structure

E. None of the above

点击查看答案

第8题

47The major difference between PERT and CPM networks is: A.PERT requires three time estima

47 The major difference between PERT and CPM networks is:

A. PERT requires three time estimates whereas CPM requires one time estimate.

B. PERT is used for construction projects whereas CPM is used for R & D.

C. PERT addresses only time whereas CPM also includes cost and resource availability.

D. PERT requires computer solutions whereas CPM is a manual technique.

E. PERT is measured in days whereas CPM uses weeks or months

点击查看答案

第9题

PERT和CPM的最根本区别是()。

A.CPM的工作逻辑关系肯定,PERT的工作逻辑关系不确定

B.CPM使用最大可能工作时间估计,PERT使用加权平均时间估计

C.CPM的工作必须进行,PERT的某些工作可以不进行

D.CPM不允许存在回路,PERT中可以存在回路

点击查看答案
下载上学吧APP
客服
TOP
重置密码
账号:
旧密码:
新密码:
确认密码:
确认修改
购买搜题卡查看答案
购买前请仔细阅读《购买须知》
请选择支付方式
微信支付
支付宝支付
选择优惠券
优惠券
请选择
点击支付即表示你同意并接受《服务协议》《购买须知》
立即支付
搜题卡使用说明

1. 搜题次数扣减规则:

功能 扣减规则
基础费
(查看答案)
加收费
(AI功能)
文字搜题、查看答案 1/每题 0/每次
语音搜题、查看答案 1/每题 2/每次
单题拍照识别、查看答案 1/每题 2/每次
整页拍照识别、查看答案 1/每题 5/每次

备注:网站、APP、小程序均支持文字搜题、查看答案;语音搜题、单题拍照识别、整页拍照识别仅APP、小程序支持。

2. 使用语音搜索、拍照搜索等AI功能需安装APP(或打开微信小程序)。

3. 搜题卡过期将作废,不支持退款,请在有效期内使用完毕。

请使用微信扫码支付(元)
订单号:
遇到问题请联系在线客服
请不要关闭本页面,支付完成后请点击【支付完成】按钮
遇到问题请联系在线客服
恭喜您,购买搜题卡成功 系统为您生成的账号密码如下:
重要提示: 请勿将账号共享给其他人使用,违者账号将被封禁。
发送账号到微信 保存账号查看答案
怕账号密码记不住?建议关注微信公众号绑定微信,开通微信扫码登录功能
警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

- 微信扫码关注上学吧 -
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反上学吧购买须知被冻结。您可在“上学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
- 微信扫码关注上学吧 -
请用微信扫码测试
选择优惠券
确认选择
谢谢您的反馈

您认为本题答案有误,我们将认真、仔细核查,如果您知道正确答案,欢迎您来纠错

上学吧找答案