第1题
A budget estimate should give the manager cost data accurate to within:
A . -5 to +10 percent of actual cost
B . -25 to +75 percent of actual cost
C . -30 to +75 percent of actual cost
D . -10 to +25 percent of actual cost
E . None of the above
第2题
187 A budget estimate should give the manager cost data accurate to within:
A. -5 to +10 percent of actual cost
B. -25 to +75 percent of actual cost
C. -30 to +75 percent of actual cost
D. -10 to +25 percent of actual cost
E. None of the above
第3题
A.Determine if there is room in the project budget for the additional cost .
B.Select the product with the lower life-cycle cost .
C.Select the product with the best life-cycle cost to earned value ratio .
D.Select the product with the lowest maintenance cost to life-cycle cost ratio .
第4题
A) assessment B) announcement C) estimate D) evaluation
第5题
59 A _____ estimate prepared from layouts, sketches and flowsheets, should be accurate within (-10, +25%).
A. Parametric
B. Definitive.
C. Budget
D. Bottom up.
E. Top down
第6题
177 A _____ estimate prepared from layouts, sketches and flowsheets, should be accurate within (-10, +25%).
A. Parametric
B. Definitive.
C. Budget
D. Bottom up. E
. Top down
第7题
114 The Cost Performance Index is computed as:
A. budget cost of work performed divided by actual cost of work performed
B. budget cost of work performed minus actual cost of work performed
C. budget cost of work performed minus budget cost of work scheduled
D. budget cost of work scheduled divided by budget cost of work performed
E. actual cost of work scheduled divided by budget cost of work performed
第8题
A、Production budget
B、Distribution cost budget
C、Selling cost budget
D、Cash budget
第9题
The Cost Performance Index is computed as:
A . budget cost of work performed divided by actual cost of work performed
B . budget cost of work performed minus actual cost of work performed
C . budget cost of work performed minus budget cost of work scheduled
D . budget cost of work scheduled divided by budget cost of work performed
E . actual cost of work scheduled divided by budget cost of work performed
第10题
196 The Cost Performance Index is computed as:
A. budget cost of work performed divided by actual cost of work performed
B. budget cost of work performed minus actual cost of work performed
C. budget cost of work performed minus budget cost of work scheduled
D. budget cost of work scheduled divided by budget cost of work performed
E. actual cost of work scheduled divided by budget cost of work performed
为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!