[单选题]

Project()Management includes the processes required to ensure that theproj ect includes all the work required, and only the work required, to complete the project successfully.

A.Integration

B.Scope

C.Configuration

D.Requirement

答案
B、Scope

该题的关键词为"all the work required, only the work required",其语句结构为"Project()Management(主语)includes(谓语)the processes",含义为"项目什么管理包含过程",仅根据关键词便可判断出应该与项目范围管理紧密相关,在结合语句分析,应该选择项目范围管理,即Scope。

更多“Project()Management includes the processes required to ensure that theproj ect includes all the work…”相关的问题

第1题

Project (24) Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.

A.Integration

B.Scope

C.Configuration

D.Requirement

点击查看答案

第2题

Project (75).Management:includes the processes required to ensure that the project includes au the word required, and only the work required, to complete the project successfully.

A.Integration

B.Configuration

C.Scope

D.Requirement

点击查看答案

第3题

● Project (69) Management includes the processes required to ensure thatthe project includes all the work required, and only the work required, tocomplete the project successfully.

t

A.Integration

B.Scope

C.Configuration

D.Requiremen

点击查看答案

第4题

● Project (69) Management includes the processes required to ensure thatthe project includes all the work required, and only the work required, tocomplete the project successfully.

t

A.Integration

B.Scope

C.Configuration

D.Requiremen

点击查看答案

第5题

Project(69)Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.

A.Integration

B.Scope

C.Configuration

D.Requirement

点击查看答案

第6题

Project Integration Management includes the processes and activities to identify, define, combine, unify, and coordinate the various processes and project management activities within the Project Management Process Groups.()process does not belong to Project Integration Management.

A.Developing project charter

B.Developing project management plan

C.Analyzing project risks

D.Monitoring and controlling project

点击查看答案

第7题

An application architecture specifies the technologies to be used to implement one or more information systems. It serves as an outline for detailed design, construction, and implementation. Given the models and details, include( ), we can distribute data and processes to create a general design of application architecture. The design will normally be constrained by architecture standards, project objectives, and ( ). The first physical DFD to be drawn is the( ). The next step is to distribute data stores to different processors. Data( ) are two types of distributed data which most RDBMSs support. There are many distribution options used in data distribution. In the case of ( )we should record each table as a data store on the physical DFD and connect each to the appropriate server.

A.logical DFDs and ERDB.ideal object model and analysis class modelC.use case models and interface prototypesD.physical DFDs and database schemaA.the database management systemB.the feasibility of techniques usedC.the network topology and technologyD.the user interface and process methodsA.context DFDB.system DFDC.network architecture DFDD.event-response DFDA.vertical partitioning and horizontal replicationB.vertical replication and horizontal partitioningC.integration and distributionD.partitioning and replicationA.storing all data on a single serverB.storing specific tables on different serversC.storing subsets of specific tables on different serversD.duplicating specific tables or subsets on different servers

点击查看答案

第8题

Risk management allows the project manager and the project team not to(71). A.eliminate most risks during the planning phase of the project B.identify project risks C.identify impacts of various risks D.plan suitable responses

点击查看答案

第9题

Risk management allows the project manager and the project team not to(71). A.eliminate most risks during the planning phase of the project B.identify project risks C.identify impacts of various risks D.plan suitable responses

点击查看答案

第10题

● A project management technique that is currently in widespread use is the (71) . The purpose of this technique is to detail, in hierarchical fashion, all of the activities that are required to meet project objectives. There are some special activities called (72) , which are events that signify the accomplishment or completion of major deliverables during the project. Most system development methodologies also provide (73) , whose purpose is to contain the various pieces of relevant information – feasibility assessments, schedules, needs analysis, and so forth – in a single place so that they can be presented to project clients and other related parties. Several types of important network diagrams are used in project management. (74) was developed to make clear the interdependence between project tasks before those tasks are scheduled. (75) offers the advantage of clearly showing overlapping tasks.

点击查看答案
下载上学吧APP
客服
TOP
重置密码
账号:
旧密码:
新密码:
确认密码:
确认修改
购买搜题卡查看答案
购买前请仔细阅读《购买须知》
请选择支付方式
微信支付
支付宝支付
选择优惠券
优惠券
请选择
点击支付即表示你同意并接受《服务协议》《购买须知》
立即支付
搜题卡使用说明

1. 搜题次数扣减规则:

功能 扣减规则
基础费
(查看答案)
加收费
(AI功能)
文字搜题、查看答案 1/每题 0/每次
语音搜题、查看答案 1/每题 2/每次
单题拍照识别、查看答案 1/每题 2/每次
整页拍照识别、查看答案 1/每题 5/每次

备注:网站、APP、小程序均支持文字搜题、查看答案;语音搜题、单题拍照识别、整页拍照识别仅APP、小程序支持。

2. 使用语音搜索、拍照搜索等AI功能需安装APP(或打开微信小程序)。

3. 搜题卡过期将作废,不支持退款,请在有效期内使用完毕。

请使用微信扫码支付(元)
订单号:
遇到问题请联系在线客服
请不要关闭本页面,支付完成后请点击【支付完成】按钮
遇到问题请联系在线客服
恭喜您,购买搜题卡成功 系统为您生成的账号密码如下:
重要提示: 请勿将账号共享给其他人使用,违者账号将被封禁。
发送账号到微信 保存账号查看答案
怕账号密码记不住?建议关注微信公众号绑定微信,开通微信扫码登录功能
警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

- 微信扫码关注上学吧 -
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反上学吧购买须知被冻结。您可在“上学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
- 微信扫码关注上学吧 -
请用微信扫码测试
选择优惠券
确认选择
谢谢您的反馈

您认为本题答案有误,我们将认真、仔细核查,如果您知道正确答案,欢迎您来纠错

上学吧找答案