A.Developing project charter
B.Developing project management plan
C.Analyzing project risks
D.Monitoring and controlling project
第1题
A、Iteration
B、Integration
C、Both of the two
D、None of the two
第2题
A.Integration
B.Scope
C.Configuration
D.Requirement
第3题
42 The project manager has, as a prime responsibility, to assure proper integration of activities. In which organizational form. does the project manager probably have the easiest time in integrating work? A. Matrix
B. Classical
C. Expediter
D. Coordinator
E. Pure project
第4题
A . Matrix
B . Classical
C . Expediter
D . Coordinator
E . Pure project
第5题
160 The project manager has, as a prime responsibility, to assure proper integration of activities. In which organizational form. does the project manager probably have the easiest time in integrating work? A. Matrix
B. Classical
C. Expediter
D. Coordinator
E. Pure project
第6题
The core function of the project manager is
A . Systems design
B . Client interfacing
C . Quality assurance
D . integration
第7题
164 Perhaps the biggest problem facing the project manager during integration activities within a matrix structure is:
A. Coping with employees who report to multiple bosses
B. Too much sponsorship involvement
C. Unclear functional understanding of the technical requirements
D. Escalating project costs
E. All of the above
第8题
46 Perhaps the biggest problem facing the project manager during integration activities within a matrix structure is:
A. Coping with employees who report to multiple bosses
B. Too much sponsorship involvement
C. Unclear functional understanding of the technical requirements
D. Escalating project costs
E. All of the above
第9题
A、Testing
B、Project Planning
C、Implementation and integration
D、Documenting
第10题
55 The core function of the project manager is
A. Systems design
B. Client interfacing
C. Quality assurance
D. integration