重要提示: 请勿将账号共享给其他人使用,违者账号将被封禁!
查看《购买须知》>>>
找答案首页 > 全部分类 > 财会类考试
搜题
网友您好, 请在下方输入框内输入要搜索的题目:
搜题
题目内容 (请给出正确答案)
[主观题]

合同权利义务的转让,是()。A.变更合同的权利B.变更合同的义务C.变更合同的主体D.变更合同的客

合同权利义务的转让,是()。

A.变更合同的权利

B.变更合同的义务

C.变更合同的主体

D.变更合同的客体

查看答案
更多“合同权利义务的转让,是()。A.变更合同的权利B.变更合同的义务C.变更合同的主体D.变更合同的客”相关的问题

第1题

What caused the earlier traffic problem?A.A closed roadB.Highway constructionC.Terrible dr

What caused the earlier traffic problem?

A.A closed road

B.Highway construction

C.Terrible driving conditions due to storm

D.Everyone leaving the city for the long weekend

点击查看答案

第2题

What' s happening on the road this evening?A.There' s a road construction on the Inner Cit

What' s happening on the road this evening?

A.There' s a road construction on the Inner City Bypass.

B.There' s a car accident on Smith' s Road.

C.Many traffic lights are out of order on the Southern Highway.

D.Routes south is the best way to go without any delays.

点击查看答案

第3题

What will happen on October 22?A.The road will be closed.B.New traffic signals will be ins

What will happen on October 22?

A.The road will be closed.

B.New traffic signals will be installed.

C.The reconstruction of some streets will begin.

D.The construction will be complete.

点击查看答案

第4题

听力原文:Good morning, commuters. This is YQN104 traffic report. On Highway 7 going south,
traffic is moving slowly due to fog which is still heavy in some places. If you're heading south, we recommend taking Highway 17 as an alternative route since foggy conditions have already cleared on this road. Remember that highway construction is scheduled to begin tomorrow along Highway 17 from Cherry Street up to the Delta Road exit. You may want to avoid that area for the next few weeks. Now, after our commercial break we will be with Robin for the sports updates. So please stay tuned.

According to the report, what caused the traffic delay this morning?

A.Road construction

B.Broken traffic signal

C.A special parade

D.Poor weather conditions

点击查看答案

第5题

Road Construction Notice for Kerry Wood DriveConstruction on Kerry Wood Drive between Tayl

Road Construction Notice for Kerry Wood Drive

Construction on Kerry Wood Drive between Taylor Drive and 58A Street will result in a combination of road closures and local detours over the next few weeks.

The road closure is required to allow contractors to install underground services, the reconstruction of the 55, 56 and 57 Street intersections and the installation of traffic relieving features oh Kerry Wood Drive.

Construction begins today, September 20, and is expected to be complete by October 22. Motorists are advised to use alternate routes to get to their destinations.

We thank you for your patience and cooperation.

For more information, please contact:

The City of North Dom

Engineering Services Department

(403)342-8158

Why is the road closure needed?

A.To install traffic relieving features.

B.To pave Kerry Wood Drive.

C.To install traffic signals.

D.To install detour signs.

点击查看答案

第6题

What will happen on January 5th?A.People will notify the city government of the traffic pr

What will happen on January 5th?

A.People will notify the city government of the traffic problem.

B.People will not go outside because of heavy traffic.

C.People will walk all together from Memorial park to City Hall to celebrate their success.

D.There will be a road construction by city government.

点击查看答案

第7题

The committee has anticipated the problems that _______ in the road construction project.A

The committee has anticipated the problems that _______ in the road construction project.

A.arise

B.will arise

C.arose

D.have arisen

点击查看答案

第8题

The committee has anticipated the problems that _______ in the road construction project.A

The committee has anticipated the problems that _______ in the road construction project.

A.arise

B.will arise

C.arose

D.have arisen

点击查看答案

第9题

阅读理解阅读下面的文章,根据文章内容,完成相应的选择题。(每题10分)ROAD CLOSURE PROCEDURES I

阅读理解

阅读下面的文章,根据文章内容,完成相应的选择题。(每题10分)

ROAD CLOSURE PROCEDURES IN SYDNEY

To minimize traffic jams in the city center and on major roads out of Sydney, the City's highway department will not agree to road closures scheduled for weekdays or Saturdays. On minor roads outside the city center, weekdays and Saturdays may be considered. You must apply for approval to do roadwork and other road-related activities, tree cutting and use of very large construction machinery, ladders, etc. Please note that approval is needed if you plan to block the road or footpath.

Applications to have a road closed to traffic must be completed and sent to the Department's Traffic Calming Committee at least a month before the scheduled date.

Roads can be closed partially or fully, depending on your requirements. Partial road closures are only allowed in light traffic areas where there will be at least 1 lane for traffic with extra traffic control measures to make sure 2-way traffic can continue to run for the duration of the work. Any change of traffic flow will require the proposal to be treated as a full road closure. For further information about a partial road closure, please refer to Contacts.

If you are organizing a parade, march or other type of street-based event, approval is also required and we recommend you choose one of our 4 preferred routes. Choosing an existing route reduces the amount of planning you will need to do.

操作提示:通过题干后的下拉框选择题目的正确答案。

1. As a rule, Sydney's highway department will agree to road closures in the city centre scheduled for __________. {A; B; C}

A. weekdays

B. Saturdays

C. Sundays

2. If you want a road closed to traffic, you must complete your applications and send them to the relevant committee at least__________ before the scheduled date. {A; B; C}

A. a week

B. 30 days

C. two months

3. Partial of full road closures are decided by _________. {A; B; C}

A. the requirements from applicants

B. the traffic flow

C. the road conditions

4. Which is NOT the condition for partial road closures according to the passage? {A; B; C}

A. In light traffic areas.

B. On work days.

C. There will be at least 1 lane for traffic during the work.

5. Which is the best title of this passage? {A; B; C}

A. Road Closure Procedures in Sydney

B. Road Conditions in Sydney

C. Road Management in Sydney

点击查看答案

第10题

A.Any road without traffic lights.B.Any highway without crossroad.C.It's a road where

A.Any road without traffic lights.

B.Any highway without crossroad.

C.It's a road where the drivers do not pay.

D.It's a highway not controlled by the government.

点击查看答案
下载上学吧APP
客服
TOP
重置密码
账号:
旧密码:
新密码:
确认密码:
确认修改
购买搜题卡查看答案
购买前请仔细阅读《购买须知》
请选择支付方式
微信支付
支付宝支付
选择优惠券
优惠券
请选择
点击支付即表示你同意并接受《服务协议》《购买须知》
立即支付
搜题卡使用说明

1. 搜题次数扣减规则:

功能 扣减规则
基础费
(查看答案)
加收费
(AI功能)
文字搜题、查看答案 1/每题 0/每次
语音搜题、查看答案 1/每题 2/每次
单题拍照识别、查看答案 1/每题 2/每次
整页拍照识别、查看答案 1/每题 5/每次

备注:网站、APP、小程序均支持文字搜题、查看答案;语音搜题、单题拍照识别、整页拍照识别仅APP、小程序支持。

2. 使用语音搜索、拍照搜索等AI功能需安装APP(或打开微信小程序)。

3. 搜题卡过期将作废,不支持退款,请在有效期内使用完毕。

请使用微信扫码支付(元)
订单号:
遇到问题请联系在线客服
请不要关闭本页面,支付完成后请点击【支付完成】按钮
遇到问题请联系在线客服
恭喜您,购买搜题卡成功 系统为您生成的账号密码如下:
重要提示: 请勿将账号共享给其他人使用,违者账号将被封禁。
发送账号到微信 保存账号查看答案
怕账号密码记不住?建议关注微信公众号绑定微信,开通微信扫码登录功能
警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

- 微信扫码关注上学吧 -
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反上学吧购买须知被冻结。您可在“上学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
- 微信扫码关注上学吧 -
请用微信扫码测试
选择优惠券
确认选择
谢谢您的反馈

您认为本题答案有误,我们将认真、仔细核查,如果您知道正确答案,欢迎您来纠错

上学吧找答案