合同权利义务的转让,是()。
A.变更合同的权利
B.变更合同的义务
C.变更合同的主体
D.变更合同的客体
第1题
What caused the earlier traffic problem?
A.A closed road
B.Highway construction
C.Terrible driving conditions due to storm
D.Everyone leaving the city for the long weekend
第2题
What' s happening on the road this evening?
A.There' s a road construction on the Inner City Bypass.
B.There' s a car accident on Smith' s Road.
C.Many traffic lights are out of order on the Southern Highway.
D.Routes south is the best way to go without any delays.
第3题
What will happen on October 22?
A.The road will be closed.
B.New traffic signals will be installed.
C.The reconstruction of some streets will begin.
D.The construction will be complete.
第4题
According to the report, what caused the traffic delay this morning?
A.Road construction
B.Broken traffic signal
C.A special parade
D.Poor weather conditions
第5题
Road Construction Notice for Kerry Wood Drive
Construction on Kerry Wood Drive between Taylor Drive and 58A Street will result in a combination of road closures and local detours over the next few weeks.
The road closure is required to allow contractors to install underground services, the reconstruction of the 55, 56 and 57 Street intersections and the installation of traffic relieving features oh Kerry Wood Drive.
Construction begins today, September 20, and is expected to be complete by October 22. Motorists are advised to use alternate routes to get to their destinations.
We thank you for your patience and cooperation.
For more information, please contact:
The City of North Dom
Engineering Services Department
(403)342-8158
Why is the road closure needed?
A.To install traffic relieving features.
B.To pave Kerry Wood Drive.
C.To install traffic signals.
D.To install detour signs.
第6题
What will happen on January 5th?
A.People will notify the city government of the traffic problem.
B.People will not go outside because of heavy traffic.
C.People will walk all together from Memorial park to City Hall to celebrate their success.
D.There will be a road construction by city government.
第7题
The committee has anticipated the problems that _______ in the road construction project.
A.arise
B.will arise
C.arose
D.have arisen
第8题
The committee has anticipated the problems that _______ in the road construction project.
A.arise
B.will arise
C.arose
D.have arisen
第9题
阅读理解
阅读下面的文章,根据文章内容,完成相应的选择题。(每题10分)
ROAD CLOSURE PROCEDURES IN SYDNEY
To minimize traffic jams in the city center and on major roads out of Sydney, the City's highway department will not agree to road closures scheduled for weekdays or Saturdays. On minor roads outside the city center, weekdays and Saturdays may be considered. You must apply for approval to do roadwork and other road-related activities, tree cutting and use of very large construction machinery, ladders, etc. Please note that approval is needed if you plan to block the road or footpath.
Applications to have a road closed to traffic must be completed and sent to the Department's Traffic Calming Committee at least a month before the scheduled date.
Roads can be closed partially or fully, depending on your requirements. Partial road closures are only allowed in light traffic areas where there will be at least 1 lane for traffic with extra traffic control measures to make sure 2-way traffic can continue to run for the duration of the work. Any change of traffic flow will require the proposal to be treated as a full road closure. For further information about a partial road closure, please refer to Contacts.
If you are organizing a parade, march or other type of street-based event, approval is also required and we recommend you choose one of our 4 preferred routes. Choosing an existing route reduces the amount of planning you will need to do.
操作提示:通过题干后的下拉框选择题目的正确答案。
1. As a rule, Sydney's highway department will agree to road closures in the city centre scheduled for __________. {A; B; C}
A. weekdays
B. Saturdays
C. Sundays
2. If you want a road closed to traffic, you must complete your applications and send them to the relevant committee at least__________ before the scheduled date. {A; B; C}
A. a week
B. 30 days
C. two months
3. Partial of full road closures are decided by _________. {A; B; C}
A. the requirements from applicants
B. the traffic flow
C. the road conditions
4. Which is NOT the condition for partial road closures according to the passage? {A; B; C}
A. In light traffic areas.
B. On work days.
C. There will be at least 1 lane for traffic during the work.
5. Which is the best title of this passage? {A; B; C}
A. Road Closure Procedures in Sydney
B. Road Conditions in Sydney
C. Road Management in Sydney
第10题
A.Any road without traffic lights.
B.Any highway without crossroad.
C.It's a road where the drivers do not pay.
D.It's a highway not controlled by the government.
为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!