此题为多项选择题。
第1题
QUEST . Which percent of the total project labor hours are typically expended by the end of the second phase of the project life cycle?
A . 5%
B . 10%
C . 15%
D . 25%
E . 50%
第2题
177 Which percent of the total project labor hours are typically expended by the end of the second phase of the project life cycle?
A. 5%
B. 10%
C. 15%
D. 25%
E. 50%
第3题
95 Which percent of the total project labor hours are typically expended by the end of the second phase of the project life cycle?
A. 5%
B. 10%
C. 15%
D. 25%
E. 50%
第4题
A local engineering firm is bidding on a design project for a new client. The total budgeted direct-labor costs for the firm are $800,000. The total budgeted indirect costs are $1,200,000. It is estimated that there are 16,000 billable hours in total. Required: a. What is the budgeted direct-labor cost rate? b. What is the budgeted indirect-cost rate assuming direct-labor cost is the allocation base? c. What should be the engineering firm bid on the project if the direct labor hours are estimated at 500 hours?
第5题
A、$240,000
B、$245,000
C、$300,000
D、350,000
第6题
100 The most common method for pricing out non-burdened labor hours for a three year project would be to:
A. Price out the hours at the actual salary of the people to be assigned.
B. Price out the work using a company-wide average labor rate.
C. Price out the work using a functional group average labor rate.
D. All of the above.
E. A and B only
第7题
182 The most common method for pricing out non-burdened labor hours for a three year project would be to:
A. Price out the hours at the actual salary of the people to be assigned.
B. Price out the work using a company-wide average labor rate.
C. Price out the work using a functional group average labor rate.
D. All of the above.
E. A and B only
第8题
● Graphical displays of accumulated cost and labor hours, plotted as a function of time, are called:
A Variance reports
B S curves
C Trend analysis
D Earned value reporting
E Baseline control
第9题
A、The total number of hours worked rose.
B、The total number of hours worked stayed the same.
C、The total number of hours worked fell.
D、Both b and c are correct.