第1题
74 When comparing the cost of competing projects, which of the following is typically NOT considered?
A. Opportunity costs.
B. Direct costs.
C. Sunk costs.
D. Indirect costs.
E. Burden rates
第2题
A.Opportunity costs.
B.Direct costs.
C.Sunk costs.
D.Indirect costs.
E.Burden rates.
第3题
● Project tradeoffs are usually made by comparing _____ and constraints.
A Time, cost, and quality
B Time, risk, and quality
C Risk, quality, and manpower availability
D Cost, quality, and technical performance
E Cost, quality, and risk
第4题
85 Project tradeoffs are usually made by comparing _____ and constraints.
A. Time, cost, and quality
B. Time, risk, and quality
C. Risk, quality, and manpower availability
D. Cost, quality, and technical performance
E. Cost, quality, and risk
第5题
3 Project tradeoffs are usually made by comparing _____ and constraints.
A. Time, cost, and quality
B. Time, risk, and quality
C. Risk, quality, and manpower availability
D. Cost, quality, and technical performance
E. Cost, quality, and risk
第6题
A.Metrics
B.Measurement
C.Benchmarking
D.Baseline
第7题
Project tradeoffs are usually made by comparing _____ and constraints.
ATime, cost, and quality
BTime, risk, and quality
CRisk, quality, and manpower availability
DCost, quality, and technical performance
ECost, quality, and risk
第8题
Concrete is used in extensive projects because of ______.
A.the increase in traffic
B.the cost of other materials
C.the change of the climate
D.the construction of the roads
第9题
Concrete is used in extensive projects because of ______.
A.the increase in traffic
B.the cost of other materials
C.the change of the climate
D.the construction of the roads