重要提示: 请勿将账号共享给其他人使用,违者账号将被封禁!
查看《购买须知》>>>
找答案首页 > 全部分类 > 建筑工程类考试
搜题
网友您好, 请在下方输入框内输入要搜索的题目:
搜题
题目内容 (请给出正确答案)
[多选题]

免责条款的特征包括()。

A.免责条款的内容在法律规定的范围内有效

B.免责条款具有免责性

C.免责条款具有明示性

D.免责条款具有事后调整性

E.免责条款具有约定性

查看答案
更多“免责条款的特征包括()。A.免责条款的内容在法律规定的范围内有效B.免责条款具有免责性C.免责条款”相关的问题

第1题

74When comparing the cost of competing projects, which of the following is typically NOT c

74 When comparing the cost of competing projects, which of the following is typically NOT considered?

A. Opportunity costs.

B. Direct costs.

C. Sunk costs.

D. Indirect costs.

E. Burden rates

点击查看答案

第2题

When comparing the cost of competing projects, which of the following is typically NOT con
sidered?

A.Opportunity costs.

B.Direct costs.

C.Sunk costs.

D.Indirect costs.

E.Burden rates.

点击查看答案

第3题

●Project tradeoffs are usually made by comparing _____ and constraints.ATime, cost, and qu

● Project tradeoffs are usually made by comparing _____ and constraints.

A Time, cost, and quality

B Time, risk, and quality

C Risk, quality, and manpower availability

D Cost, quality, and technical performance

E Cost, quality, and risk

点击查看答案

第4题

85Project tradeoffs are usually made by comparing _____ and constraints. A.Time, cost, and

85 Project tradeoffs are usually made by comparing _____ and constraints.

A. Time, cost, and quality

B. Time, risk, and quality

C. Risk, quality, and manpower availability

D. Cost, quality, and technical performance

E. Cost, quality, and risk

点击查看答案

第5题

3Project tradeoffs are usually made by comparing _____ and constraints. A.Time, cost, and

3 Project tradeoffs are usually made by comparing _____ and constraints.

A. Time, cost, and quality

B. Time, risk, and quality

C. Risk, quality, and manpower availability

D. Cost, quality, and technical performance

E. Cost, quality, and risk

点击查看答案

第6题

involves comparing actual or planned project practices to those of other projects to g
enerate ideas for improvement and to provide a basis by which to measure performance. These other projects can be within the performing organization or outside of it,and can be within the same or in another application area.

A.Metrics

B.Measurement

C.Benchmarking

D.Baseline

点击查看答案

第7题

Project tradeoffs are usually made by comparing _____ and constraints.ATime, cost, and qua

Project tradeoffs are usually made by comparing _____ and constraints.

ATime, cost, and quality

BTime, risk, and quality

CRisk, quality, and manpower availability

DCost, quality, and technical performance

ECost, quality, and risk

点击查看答案

第8题

Concrete is used in extensive projects because of ______.A.the increase in trafficB.the co

Concrete is used in extensive projects because of ______.

A.the increase in traffic

B.the cost of other materials

C.the change of the climate

D.the construction of the roads

点击查看答案

第9题

Concrete is used in extensive projects because of ______.A.the increase in trafficB.the co

Concrete is used in extensive projects because of ______.

A.the increase in traffic

B.the cost of other materials

C.the change of the climate

D.the construction of the roads

点击查看答案
下载上学吧APP
客服
TOP
重置密码
账号:
旧密码:
新密码:
确认密码:
确认修改
购买搜题卡查看答案
购买前请仔细阅读《购买须知》
请选择支付方式
微信支付
支付宝支付
选择优惠券
优惠券
请选择
点击支付即表示你同意并接受《服务协议》《购买须知》
立即支付
搜题卡使用说明

1. 搜题次数扣减规则:

功能 扣减规则
基础费
(查看答案)
加收费
(AI功能)
文字搜题、查看答案 1/每题 0/每次
语音搜题、查看答案 1/每题 2/每次
单题拍照识别、查看答案 1/每题 2/每次
整页拍照识别、查看答案 1/每题 5/每次

备注:网站、APP、小程序均支持文字搜题、查看答案;语音搜题、单题拍照识别、整页拍照识别仅APP、小程序支持。

2. 使用语音搜索、拍照搜索等AI功能需安装APP(或打开微信小程序)。

3. 搜题卡过期将作废,不支持退款,请在有效期内使用完毕。

请使用微信扫码支付(元)
订单号:
遇到问题请联系在线客服
请不要关闭本页面,支付完成后请点击【支付完成】按钮
遇到问题请联系在线客服
恭喜您,购买搜题卡成功 系统为您生成的账号密码如下:
重要提示: 请勿将账号共享给其他人使用,违者账号将被封禁。
发送账号到微信 保存账号查看答案
怕账号密码记不住?建议关注微信公众号绑定微信,开通微信扫码登录功能
警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

- 微信扫码关注上学吧 -
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反上学吧购买须知被冻结。您可在“上学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
- 微信扫码关注上学吧 -
请用微信扫码测试
选择优惠券
确认选择
谢谢您的反馈

您认为本题答案有误,我们将认真、仔细核查,如果您知道正确答案,欢迎您来纠错

上学吧找答案