预算定额的编制基础是()。
A.施工定额
B.预算定额
C.概算定额
D.概算指标
第1题
Feasibility studies occur in which life cycle phase (s)?
A.Conceptual
B.Conceptual or Development
C.Execution
D.Preliminary planning
E.any life cycle phase
第2题
● Feasibility studies occur in which life cycle phase (s)?
A Conceptual
B Conceptual or Development
C Execution
D Preliminary planning
E any life cycle phase
第3题
141 Feasibility studies occur in which life cycle phase (s)?
A. Conceptual
B. Conceptual or Development
C. Execution
D. Preliminary planning
E. any life cycle phase
第4题
A.The project life cycle typically changes and evolves with the project.
B.The project management life cycle is unique to every project.
C.The project life cycle is can be referred to as the Project Management Life Cycle.
D.The product life cycle typically involves more than one project life cycle.
第5题
B、Every software system has its life cycle
C、Software life cycle is the period of time that a software product is in service
D、Software life cycle is the cycling through phases of specification, design, implementation, and testing
第6题
A、life cycle analysis
B、life cycle assessment
C、green design
D、design for assembly
第7题
A.Software life cycle is the repetitive nature of software testing
B.Every software system has its life cycle
C.Software life cycle is the period of time that a software product is in service
D.Software life cycle is the cycling through phases of specification, design, implementation, and testing
第8题
Which systems development life cycle models include two parts of other models?
A.Rapid application development
B.Joint application development
C.SDLC model
D.The spiral model
第9题
During which phase of the project life cycle is the amount at stake lowest?
A concept
B development
C execution
D conclusion
E C and D