第1题
79 The zero defects concept
A. is a performance standard for management
B. is a motivational technique that promotes "doing it right the first time".
C. is used by management to communicate to all employees that everyone should do things right the first time.
D. A and C.
E. B and C
第2题
The zero defects concept
A . is a performance standard for management
B . is a motivational technique that promotes "doing it right the first time".
C . is used by management to communicate to all employees that everyone should do things right the first time.
D . A and C.
E . B and C
第3题
Which of the following is not part of a modem quality management concept?(74)
A.Performance standard is zero defects
B.Quality must be inspected in
C.85% of failures occur because of the process, not the worker
D.Quality is a 4 cycle process plan/do/check/act
第4题
● Which of the following is not part of a modern quality management concept?(74)
(74)
A.Performance standard is zero defects
B.Quality must be inspected in
C.85% of failures occur because of the process, not the worker
D.Quality is a 4 cycle process – plan/do/check/act
第5题
● Which of the following is not part of a modern quality management concept?(74)
(74)
A.Performance standard is zero defects
B.Quality must be inspected in
C.85% of failures occur because of the process, not the worker
D.Quality is a 4 cycle process – plan/do/check/act
第6题
67 Life Cycle Costing:
A. is the concept of including all costs within the total life of a project.
B. is an activity devoted to optimizing cost/performance
C. is an activity of appraising the cost and technical performance of a completed project.
D. is a process of predicting the life of a project.
E. None of the above.
第7题
185 Life Cycle Costing:
A. is the concept of including all costs within the total life of a project.
B. is an activity devoted to optimizing cost/performance
C. is an activity of appraising the cost and technical performance of a completed project.
D. is a process of predicting the life of a project.
E. None of the above
第8题
Which of the following are among Phil Crosby's "absolutes of quality'.
A . the performance of standard is zero defects
B . do everything right the first time, each time
C . constantly improve each product and each service
D . the measurement system is the cost of nonconformance
E . A and D only
第9题
41 Which of the following are among Phil Crosby's "absolutes of quality'.
A. the performance of standard is zero defects
B. do everything right the first time, each time
C. constantly improve each product and each service
D. the measurement system is the cost of nonconformance
E. A and D only
第10题
The "zero defect" concept was proposed by:
A . Deming
B . Juran
C . Crosby
D . Tagushi
E . A and D only