重要提示: 请勿将账号共享给其他人使用,违者账号将被封禁!
查看《购买须知》>>>
找答案首页 > 全部分类 > 建筑工程类考试
搜题
网友您好, 请在下方输入框内输入要搜索的题目:
搜题
题目内容 (请给出正确答案)
[主观题]

根据某建设工程的有关数据(见下表),可知该项目的静态投资回收期为()年。A3.4 B4.8C3.8 D

根据某建设工程的有关数据(见下表),可知该项目的静态投资回收期为

()年。

根据某建设工程的有关数据(见下表),可知该项目的静态投资回收期为()年。A3.4 B4.8C3

A3.4 B4.8

C3.8 D3.2

查看答案
更多“根据某建设工程的有关数据(见下表),可知该项目的静态投资回收期为()年。A3.4 B4.8C3.8 D”相关的问题

第1题

If you must pump bilges while a vessel is in port,you should pump only ______.A.If dischar

If you must pump bilges while a vessel is in port,you should pump only ______.

A.If discharge is led to a shore tank or barge

B.During the hours of darkness

C.On the outgoing tide

D.As much as is necessary

点击查看答案

第2题

If it becomes necessary to pump bilges while a vessel is in port, which of the following p
rocedures should be followed?

A.Pump only if the discharge is led to a shore tank or barge

B.Pump only during the hours of darkness

C.Pump only on the outgoing tide

D.Pump only as much as is necessary

点击查看答案

第3题

Waste oil from the lube oil sumps of machinery may NOT be ______.A.drained into the vessel

Waste oil from the lube oil sumps of machinery may NOT be ______.

A.drained into the vessel's bilges

B.reclaimed(回收的) for other uses

C.held in a slop tank

D.purified and then reused

点击查看答案

第4题

An independent bilge suction is required for _____.A.ballast tanksB.sludge tanksC.machiner

An independent bilge suction is required for _____.

A.ballast tanks

B.sludge tanks

C.machinery space bilges

D.cargo hold bilges

点击查看答案

第5题

Sam and Sandy are twin brothers. But Sam is ______ than Sandy.

A、more outgoing

B、very outgoing

C、the most outgoing

D、most outgoing

点击查看答案

第6题

Which of the following liquids can ordinarily be discharged overboard without being proces
sed through an oily water separator?

A.Cargo tank ballast

B.Segregated ballast

C.Engine room bilges

D.Cargo pump room bilges

点击查看答案

第7题

During the PSC inspection, under the provision of SOLAS74, which one may not be regarded a
s clear grounds for ships' detainment?

A.excess amount of oily-water mixtures in bilges

B.insulation of piping including exhaust pipes in engine room contaminated by oil

C.improper operation of bilge pumping arrangements

D.paint peeling off the uptake

点击查看答案

第8题

To prevent the spread of fire by conduction, you should ______.A.cool the bulkheads around
To prevent the spread of fire by conduction, you should ______.

A.cool the bulkheads around the fire

B.remove combustibles from direct exposure

C.close all openings to the area

D.shut off all electric power

点击查看答案

第9题

The amount of fuel delivered by a helical plunger fuel injection pump is controlled by ___
___.

A.varying the pump discharge pressure

B.varying the pump return pressure

C.rotation of the pump plunger

D.rotation of the pump barrel

点击查看答案

第10题

The Company should establish in the SMS that ______has the overriding authority and the re
sponsibility to make decisions with respect to safety and pollution prevention.

A.the master

B.the chief engineer

C.the officer on duty

D.the engineer in charge of watch

点击查看答案
下载上学吧APP
客服
TOP
重置密码
账号:
旧密码:
新密码:
确认密码:
确认修改
购买搜题卡查看答案
购买前请仔细阅读《购买须知》
请选择支付方式
微信支付
支付宝支付
选择优惠券
优惠券
请选择
点击支付即表示你同意并接受《服务协议》《购买须知》
立即支付
搜题卡使用说明

1. 搜题次数扣减规则:

功能 扣减规则
基础费
(查看答案)
加收费
(AI功能)
文字搜题、查看答案 1/每题 0/每次
语音搜题、查看答案 1/每题 2/每次
单题拍照识别、查看答案 1/每题 2/每次
整页拍照识别、查看答案 1/每题 5/每次

备注:网站、APP、小程序均支持文字搜题、查看答案;语音搜题、单题拍照识别、整页拍照识别仅APP、小程序支持。

2. 使用语音搜索、拍照搜索等AI功能需安装APP(或打开微信小程序)。

3. 搜题卡过期将作废,不支持退款,请在有效期内使用完毕。

请使用微信扫码支付(元)
订单号:
遇到问题请联系在线客服
请不要关闭本页面,支付完成后请点击【支付完成】按钮
遇到问题请联系在线客服
恭喜您,购买搜题卡成功 系统为您生成的账号密码如下:
重要提示: 请勿将账号共享给其他人使用,违者账号将被封禁。
发送账号到微信 保存账号查看答案
怕账号密码记不住?建议关注微信公众号绑定微信,开通微信扫码登录功能
警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

- 微信扫码关注上学吧 -
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反上学吧购买须知被冻结。您可在“上学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
- 微信扫码关注上学吧 -
请用微信扫码测试
选择优惠券
确认选择
谢谢您的反馈

您认为本题答案有误,我们将认真、仔细核查,如果您知道正确答案,欢迎您来纠错

上学吧找答案