A.new computers had been installed in the buildings
B.it occurred in the residential areas rather than on the highways
C.large numbers of Los Angeles residents had gone for a holiday
D.improvements has been made in the construction of buildings and highways
第1题
A.14
B.16
C.30
D.32
E.62
F.64
第2题
A. 14
B. 16
C. 30
D. 32
E. 62
F. 64
第3题
A. Modify the Offline Settings option for TestKing Docs to make all files available offline.
B. Configure shadow copies of the volume containing TestKing Docs.
C. Use Task Scheduler to create a job that uses the Copy command to copy all changed documents to another folder every day.
D. Use the Backup utility to schedule a backup of all changed documents every hou
第4题
A. One network with 254 hosts.
B. 254 networks with 254 hosts per network.
C. 65,534 networks with 255 hosts per network.
D. 30 networks with 64 hosts per network.
E. 254 networks with 65,534 per network.
第5题
A.255.255.255.192
B.255.255.255.224
C.255.255.255.240
D.255.255.255.248
E.255.255.255.252
F.255.255.255.254
第6题
A.
B.
C.
D.
E.
第7题
A. Link state routing protocol is missing.
B. Incorrectly configured IP addresses
C. IGRP is incorrectly configured.
D. Frame relay is not configured.
E. None of the above
第8题
A.Wireless router
B.Hub
C.Repeater
D.Wireless network adapter
第9题
A. It is used to restart the router.
B. It is used to bypass the configuration in NVRAM.
C. It is used to enter ROM Monitor mode.
D. It is used to view the lost password.
E. It is used to save the changes to the configuration.
为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!