第1题
A.theft.pilferage&non—delivery risks
B.intermixture and contamination risks
C.failure to delivery risks
D.flesh water and/or rain damage risks
第2题
A.theft.pilferage&non—delivery risks
B.intermixture and contamination risks
C.failure to delivery risks
D.flesh water and/or rain damage risks
第3题
A.F.P.A.、TPND、war risks B.W.P.A.、shortage
C.a11 risks、leakage、war risks D.all risks、failure,of delivery、war risks
第4题
A.F.P.A.、TPND、war risks B.W.P.A.、shortage
C.a11 risks、leakage、war risks D.all risks、failure,of delivery、war risks
第5题
A、平安险(free from particular average)
B、水渍险(with particular average)
C、一切险(all risks)
D、偷窃、提货不着险(risk of theft and non delivery)
E、交货不到险(failure to deliver risk)
第6题
(A) I've tried several times, but I can't fix it.
(B) Yes, the one we've been using isn't very good.
(C) You're right, it is different.
(12)
A.
B.
C.
第7题
A.sometimes
B.has fueled
C.alterntive
D.$14 billions-a-year
第8题
第9题
【填空题】Lesson 5 课后词汇-选择填空 Delivery aerodrome positions terminal departure Area arrival tower 1. The air traffic control services could be divided into three parts as Area Control service, Approach Control service and __________ control service which is provided by control tower in most cases. 2. Air Traffic Control Services are provided by different air traffic control units in which there are different __________responsible for different jurisdictions. 3. Generally speaking, _______is the first ATC position from which pilots will request ATC clearance before engine start. 4. For arriving aircraft, Approach controller should hand off the traffic to ________once established on the localizer. 5. In order to reduce the workload of the Approach controller and make sure flight safety, Approach control could be separated into two positions, __________handling all the departing aircraft, and ____6__ handling all the arriving aircraft. 6. Departure and Arrival positions shall be opened together serving in the same_____7___Control Area. 7.___8_____Control handles the aircraft while or over flying en route in its IFR, or that climbing or descending from or into an airfield situated in its IFR.
第10题
Q: What does the man say about delivery?
M: Hello. Yes?
W: Hello. Is that the sales department?
M: Yes, it is.
W: Oh, well, my name's Jane Kingsbury of GPF Limited. Hmm, we need some supplies for our design office.
M: Uh, what's sort?
W: Well, first of all, we need one complete new drawing board.
M: A DO44 or DO45?
W: Uh, I don't know. What's the difference?
M: Well, the 45 costs 15 pounds more.
W: Hmm, so what's the total price then?
M: It's 387 pounds.
W: Does that include value added tax?
M: Oh, I'm not sure, most of the prices do. Yes, I think it does.
W: Hmm, what are the boards actually made of?
M: Oh, I don't know. I think it's a sort of plastic stuff these days. It's white anyway.
W: Hmm, and how long does it take to deliver?
M: Oh, I couldn't really say. It depends on how much work we've got and how many other orders there are to send out, you know.
W: Ok. Now we also want some drawing pens, ink and rulers and some drawing paper.
M: Oh, dear, the girl that takes orders for supplies isn't here this morning, so I can't take those orders for you. I only do the equipment, you see.
W: OK. Well, perhaps I'll ring back tomorrow.
M: So do you want the drawing board then?
W: I'll have to think about it. Thanks very much. I'll let you know. Goodbye.
M: Thank you. Goodbye.
A.It is not his responsibility.
B.It will be free for large orders.
C.It costs 15 more for express delivery.
D.It depends on a number of factors.
为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!