第1题
第2题
第3题
第5题
第6题
Translate the following English into Chinese. The Beijing–Shanghai High-Speed Railway is a 1,318-kilometre long high-speed railway that connects two major economic zones in People’s Republic of China: the Bohai Economic Rim and the Yangtze River Delta. Construction began on April 18, 2008, and a ceremony to mark the completion of track laying was held on November 15, 2010. The line opened to the public for commercial service on June 30, 2011. This rail line is the world’s longest high-speed line ever constructed in a single phase.
第8题
Directions: Translate the following English into Chinese. (10 points)
By pooling their resources together, small groups of students generally gain advantages over individuals who prefer to study alone.
第9题
为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!