施工过程质量控制是指()的投入与产出过程的质量控制。
A.工程产品
B.施工作业技术活动
C.材料和设备
D.施工活动
第1题
A.Router
B.Bridge
C.Hub
D.Switch
第2题
A. Hub
B. Bridge
C. Switch
D. Router
E. Repeaters
F. None of the above
第3题
A.Layer 1
B.Layer 3
C.Layer 4
D.Layer 5
第4题
A.Laye r2
B.Layer 3
C.Layer 5
D.Layer 7
第5题
A. end-to-end communications path
B. hosts on the same Layer 2 broadcast domain
C. hosts on the same Layer 3 broadcast domain
D. routing information on participating Layer 3 devices
第6题
A.to uniquely identify devices at Layer 2
B.to allow communication with devices on a different network
C.to differentiate a Layer 2 frame from a Layer 3 packet
D.to establish a priority system to determine which device gets to transmit first
E.to allow communication between different devices on the same network
F.to allow detection of a remote device when its physical address is unknown
第7题
A.A.6100 serves as devices at convergence layer.
B.B.9000 is used at core layer.
C.C.6200 is used at access layer and convergence layer.
D.D.6300 is used at convergence layer.
第8题
A. Layer 2
B. Layer 3
C. Layer 4
D. Layer 5
E. Layer 6
F. Layer 7
第9题
A.Layer 1
B.Layer 5
C.Layer 6
D.Layer 7
第10题
A. to uniquely identify devices at Layer 2
B. to allow communication with devices on a different network
C. to differentiate a Layer 2 frame from a Layer 3 packet
D. to establish a priority system to determine which device gets to transmit first
E. to allow communication between different devices on the same network
F. to allow detection of a remote device when its physical address is unknown
为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!