The engineer on duty ()the engine movement in the logbook now.
A.puts down
B.is putting down
C.is put down
第1题
With UMS, when the engine room is unwatched will control the main engine
A.the bridge officer on watch
B.the chief engineer
C.the duty engineer
D.the duty motorman
第2题
A.engineer on duty
B.chief engineer
C.master
第3题
A.the bridge officer on watch
B.the chief engineer
C.the duty engineer
D.the duty motorma
第4题
When the order given by bridge may have bad results, the duty engineer should .
A.inform. the captain for a further consideration, then perform. it
B.inform. the captain, and not perform. it
C.stop the M/E immediately, and then inform. the chief engineer
D.stop the M/E immediately, and then inform. the captain
第6题
If there are ______ in the repair work, please come to our duty engineer at once.
A.any problem
B.some problem
C.any problems
D.some problems
第7题
During the watch keeping at sea, routine adjustments should be ____.
A.made and noted as required by the duty engineer
B.reported to chief engineer immediately after being made by duty engineer
C.never made before getting permission from chief engineer
D.made as required but not logged
第8题
One hour before sailing, the duty engineer and officer should check ____.
A.tachometer and engine telegraph
B.oil and water reserves
C.clock and engine telegraph and test the rudder
D.crews
第9题
A.5
B.3
C.2
D.1
第10题
A.captain
B.chief engineer
C.chief engineer and captain consult together
D.chief engineer and superintend consult together
为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!