PLR Air Conditioning Center
27 West Street
Plaines City
LA America 50705
March 6, 2004
Ms. Li Chunhua, President
New Era Engineering Group
26 Renmin Street
Yangzhou, Jiangsu, China
225002
Dear Ms. Li,
Thank you very much for allowing us to present to you our recommendation for PLR Air Conditioning System. We would like to express our appreciation to Mr. Zhang and Mrs. Wu for their help as we collected the data necessary for this proposal.
After thoroughly analyzing your company's engineering requirements, we believe that you will find this proposed PLR system satisfactory. It will provide the maximum return on your investment dollar. In addition, the PLR system protects you against obsolescence(过时) in the near future—if your business continues to experience the normal growth you have experienced in the last few years—because the equipment PLR proposes to install is a modular(模块的) design to which you may add additional units as the need arises.
We believe that you will find this system practical, efficient, and economical for the needs of your company both now and in the near future. It is our sincere hope that my information ill the enclosed proposal will make your decision to install a PLR Air Conditioning System much easier.
Sincerely yours,
James P. Callahan
Sales Manager
Recommendation of a Product
Product recommended: PLR【46】
PLR'S proposal: based on the analysis of the buyer's【47】
Features of the Product: 1. It's a【48】design;
2. It's practical【49】and economical;
Document Enclosed: a/the【50】
第1题
HVAC系统是指采暖通风与空调(暖通)Heating,Ventilating and Air Conditioning。()
第2题
With ducted air conditioning systems, the modern tendency is to use____.
A.central air conditioning system
B.high velocity system
C.low velocity system
D.single duct system
第3题
In an air conditioning system, moisture is removed from the air by ______.
A.filters
B.separators
C.ducted traps
D.dehumidifiers
第5题
A.The air conditioning system is in good order.
B.There is something wrong with it.
C.The air conditioning system is out of stock.
D.The air conditioning system runs well.
第6题
A re-heater, as used in an air conditioning system, is designed to control the ______.
A.chilled water temperature
B.dew point temperature
C.primary air temperature
D.dry bulb temperature
第7题
What was the problem with the air conditioning Mr. Henry purchased?
A.The air conditioning filter wasn"t replaced.
B.The thermostat was turned down too low.
C.The freon pressure was lower than normal.
D.The fan motor was out of order.
第8题
A.Refrigeration
B.Air conditioning
C.Ventilation
D.Heating
第9题
A re-heater in an air conditioning system functions to ______.
A.control inlet air temperature
B.control inlet air volume
C.maintain relative humidity at 15%
D.restore conditioned air temperature to a comfortable level
为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!