A software requirements specification is that () .
A.a rough list of things that the proposed software ought to do
B.a precise list of things that the proposed software ought to do
C.a formal list of things that the proposed software must do
D.an estimate of the resouroes (time, money, personnel, etc) which will be required to construct the proposed software
第1题
A.对变更申请应当快速反应
B.建设单位、承建单位都具有变更申请的权利
C.应明确界定项目变更的目标
D.需求变更只需要得到建设方确认即可
第2题
A.指定专人负责项目的知识产权工作
B.监理单位只负责建设单位的知识产权保护
C.合同签订后,对于该领域的知识产权动态没必要关注
D.实施知识产权保护的监理措施包括政策措施、经济措施
第3题
A.是实施总监理工程师领导的基本条件
B.是统一下属意志不可少的领导艺术
C.基本要素有信息传播者、信息接收者、信息内容、信息传播媒介和方式
D.是监理机构人员之间传达、反馈项目情况及相关信息的过程
第4题
A.The team did not create the estimate and estimating tales too long using that method
B.The team did not create the estimate and a network diagram was not used
C.The estimate is too long and should be created by management
D.The project estimate should be the same as the customer's required completion date